United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
ONSHORE WIND Β· MISOOnshore wind project G805, Stevens County
Onshore wind project G805, Stevens County is a 300 MW onshore wind request withdrawn in the MISO interconnection queue, in Stevens County, Minnesota.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2007 (completed)
- Withdrawn / abandonedApr 2011 (project stopped here)
- ConsentedApr 2011 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G805
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Johnson Junction - Morris 115 kV
- Location
- Stevens County, Minnesota
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 5 June 2007
- Agreement signed
- 12 April 2011
- Proposed online date
- September 2012
- Withdrawn
- April 2011
Location
Marker shows the centre of Stevens County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Stevens County
- Solar project J3669, Stevens CountySolar Β· 300 MW Β· in study
- Solar project J2608, Stevens CountySolar Β· 160 MW Β· in study
- Battery storage project J2624, Stevens CountyBattery storage Β· 450 MW Β· withdrawn
- Onshore wind project G737, Stevens CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project G555, Stevens CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project G777, Stevens CountyOnshore wind Β· 20.0 MW Β· withdrawn
- Onshore wind project G644, Stevens CountyOnshore wind Β· 20.0 MW Β· withdrawn
- Onshore wind project G638, Stevens CountyOnshore wind Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem