United States βΊ Grid βΊ Interconnection queues βΊ New York
SOLAR Β· NYISOSL Portland Solar
SL Portland Solar is a 19.9 MW solar request withdrawn in the NYISO interconnection queue, in Chautauqua County, New York, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2019 (completed)
- Withdrawn / abandonedApr 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 875
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- SL Portland, LLC
- Connection point (POI)
- Dunkirk - Falconer 115 kV
- Location
- Chautauqua County, New York
- Technology
- Solar: 19.9 MW
- Total requested
- 19.9 MW
- Queue status
- Withdrawn
- Entered queue
- 6 June 2019
- Withdrawn
- April 2020
Location
Marker shows the centre of Chautauqua County; the queue data does not give exact sites.
Other requests in Chautauqua County
- South Ripley Solar and BESSSolar + storage Β· 270 MW Β· in study
- Lighthouse Energy StorageBattery storage Β· 250 MW Β· in study
- Basecamp BESSBattery storage Β· 170 MW Β· in study
- York Run SolarSolar Β· 90.0 MW Β· in study
- Dewdrop WindOnshore wind Β· 62.0 MW Β· in study
- Buttercup WindOnshore wind Β· 49.9 MW Β· in study
- Goldenrod WindOnshore wind Β· 39.0 MW Β· in study
- Cassadaga WindOnshore wind Β· 127 MW Β· built
- Cassadaga WindOnshore wind Β· 127 MW Β· built
- Ball Hill WindOnshore wind Β· 103 MW Β· built
- Ball Hill WindOnshore wind Β· 103 MW Β· built
- Arkwright SummitOnshore wind Β· 78.4 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem