ONSHORE WIND Β· WEST

Onshore wind project 407, Sweetwater County

Onshore wind project 407, Sweetwater County is a 79.8 MW onshore wind request withdrawn in the West interconnection queue, in Sweetwater County, Wyoming, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2012 (completed)
  2. Withdrawn / abandonedNov 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
407
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Rock Springs-Palisades switching station line
Location
Sweetwater County, Wyoming
Technology
Wind: 79.8 MW
Total requested
79.8 MW
Service type
Network resource (NRIS)
Study phase
IA Terminated 11/30/15 - End of Suspension
Queue status
Withdrawn
Entered queue
17 January 2012
Withdrawn
November 2015

Location

Marker shows the centre of Sweetwater County; the queue data does not give exact sites.

Power plants in Wyoming Β· Transmission lines in Wyoming

Other requests in Sweetwater County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem