North Alleghney WF

North Alleghney WF is a 50.0 MW onshore wind request built and operating in the PJM interconnection queue, in Cambria County, Pennsylvania, connecting to PENELEC.

Queue statusOperating
  1. PlanningQueued Jun 2005 (completed)
  2. ConsentedJan 2008 (completed)
  3. Construction (completed)
  4. OperatingDec 2007 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
O38
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PENELEC
Connection point (POI)
Johnstown-Altoona 230kV
Location
Cambria County, Pennsylvania
Technology
Wind: 50.0 MW
Total requested
50.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
27 June 2005
Agreement signed
29 January 2008
Proposed online date
September 2009
Came online
December 2007

Location

Marker shows the centre of Cambria County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Cambria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem