GAS Β· ISO-NE

Gas Turbine

Gas Turbine is a 200 MW gas request withdrawn in the ISO-NE interconnection queue, in Middlesex County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2005 (completed)
  2. Withdrawn / abandonedFeb 2007 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
141
Grid region
ISO-NE (New England)
Connection point (POI)
115 kV O 167 line between Everett and Mystic Subst
Location
Middlesex County, Massachusetts
Technology
Gas: 200 MW Β· Oil
Total requested
200 MW
Service type
Other
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
14 December 2005
Proposed online date
September 2009
Withdrawn
February 2007

Location

Marker shows the centre of Middlesex County; the queue data does not give exact sites.

Power plants in Massachusetts Β· Transmission lines in Massachusetts

Other requests in Middlesex County