United States β€Ί Grid β€Ί Interconnection queues β€Ί Oregon

ONSHORE WIND Β· WEST

Onshore wind project 302, Umatilla County

Onshore wind project 302, Umatilla County is a 1.2 MW onshore wind request withdrawn in the West interconnection queue, in Umatilla County, Oregon, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2009 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
302
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Boeing feeder 4K46 circuit out of Dalreed substation
Location
Umatilla County, Oregon
Technology
Wind: 1.2 MW
Total requested
1.2 MW
Service type
Network resource (NRIS)
Study phase
WITHDRAWN BY CUSTOMER
Queue status
Withdrawn
Entered queue
10 November 2009
Proposed online date
July 2011

Location

Marker shows the centre of Umatilla County; the queue data does not give exact sites.

Power plants in Oregon Β· Transmission lines in Oregon

Other requests in Umatilla County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem