Onshore wind project G0273, Kittitas County

Onshore wind project G0273, Kittitas County is a 104 MW onshore wind request withdrawn in the West interconnection queue, in Kittitas County, Washington.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2007 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G0273
Grid region
West (non-ISO utilities)
Connection point (POI)
Vantage Substation
Location
Kittitas County, Washington
Technology
Wind: 104 MW
Total requested
104 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
14 June 2007
Proposed online date
September 2008

Location

Marker shows the centre of Kittitas County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Kittitas County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem