United States βΊ Grid βΊ Interconnection queues βΊ Ohio
ONSHORE WIND Β· PJMSeneca Wind
Seneca Wind is a 100 MW onshore wind request withdrawn in the PJM interconnection queue, in Seneca County, Ohio, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2008 (completed)
- Withdrawn / abandonedNov 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- U4-029
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Fostoria Central-Greenlawn-Howard 138kV
- Location
- Seneca County, Ohio
- Technology
- Wind: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 26 December 2008
- Proposed online date
- December 2020
- Withdrawn
- November 2021
Location
Marker shows the centre of Seneca County; the queue data does not give exact sites.
Other requests in Seneca County
- Battery storage project AG2-289, Seneca CountyBattery storage Β· 66.6 MW Β· in study
- Solar project AI1-091, Seneca CountySolar Β· 49.9 MW Β· in study
- Battery storage project AG2-290, Seneca CountyBattery storage Β· 38.4 MW Β· in study
- Onshore wind project AD2-136, Seneca CountyOnshore wind Β· 360 MW Β· withdrawn
- Republic Wind LLCOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project AE2-174, Seneca CountyOnshore wind Β· 198 MW Β· withdrawn
- Onshore wind project AD2-191, Seneca CountyOnshore wind Β· 170 MW Β· withdrawn
- Seneca WindOnshore wind Β· 100 MW Β· withdrawn
- Solar + storage project AG2-465, Seneca CountySolar + storage Β· 79.0 MW Β· withdrawn