Onshore wind project AE2-174, Seneca County

Onshore wind project AE2-174, Seneca County is a 198 MW onshore wind request withdrawn in the PJM interconnection queue, in Seneca County, Ohio, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2019 (completed)
  2. Withdrawn / abandonedFeb 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AE2-174
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Fremont Center-Tiffin Center 138 kV circuit #1
Location
Seneca County, Ohio
Technology
Wind: 198 MW
Total requested
198 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Withdrawn
Entered queue
19 March 2019
Proposed online date
October 2021
Withdrawn
February 2023

Location

Marker shows the centre of Seneca County; the queue data does not give exact sites.

Power plants in Ohio Β· Transmission lines in Ohio

Other requests in Seneca County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem