ONSHORE WIND Β· PJMOnshore wind project AE2-174, Seneca County
Onshore wind project AE2-174, Seneca County is a 198 MW onshore wind request withdrawn in the PJM interconnection queue, in Seneca County, Ohio, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2019 (completed)
- Withdrawn / abandonedFeb 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AE2-174
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Fremont Center-Tiffin Center 138 kV circuit #1
- Location
- Seneca County, Ohio
- Technology
- Wind: 198 MW
- Total requested
- 198 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 19 March 2019
- Proposed online date
- October 2021
- Withdrawn
- February 2023
Location
Marker shows the centre of Seneca County; the queue data does not give exact sites.
Other requests in Seneca County
- Battery storage project AG2-289, Seneca CountyBattery storage Β· 66.6 MW Β· in study
- Solar project AI1-091, Seneca CountySolar Β· 49.9 MW Β· in study
- Battery storage project AG2-290, Seneca CountyBattery storage Β· 38.4 MW Β· in study
- Onshore wind project AD2-136, Seneca CountyOnshore wind Β· 360 MW Β· withdrawn
- Republic Wind LLCOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project AD2-191, Seneca CountyOnshore wind Β· 170 MW Β· withdrawn
- Seneca WindOnshore wind Β· 100 MW Β· withdrawn
- Seneca WindOnshore wind Β· 100 MW Β· withdrawn
- Solar + storage project AG2-465, Seneca CountySolar + storage Β· 79.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem