SOLAR + STORAGE Β· SPP

Solar + storage project GEN-2021-104, Bossier Parish County

Solar + storage project GEN-2021-104, Bossier Parish County is a 100 MW solar + storage request withdrawn in the SPP interconnection queue, in Bossier Parish County, Louisiana, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2021 (completed)
  2. Withdrawn / abandonedFeb 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2021-104
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
AEP
Connection point (POI)
138kV bus at Red Point Substation
Location
Bossier Parish County, Louisiana
Technology
Solar: 100 MW Β· Battery
Total requested
100 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
26 May 2021
Proposed online date
October 2027
Withdrawn
February 2024

Location

Marker shows the centre of Bossier Parish County; the queue data does not give exact sites.

Power plants in Louisiana Β· Transmission lines in Louisiana

Other requests in Bossier Parish County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem