United States β€Ί Grid β€Ί Interconnection queues β€Ί Kansas

ONSHORE WIND Β· SPP

Onshore wind project GEN-2016-016, Edwards County

Onshore wind project GEN-2016-016, Edwards County is a 78.2 MW onshore wind request withdrawn in the SPP interconnection queue, in Edwards County, Kansas, connecting to MIDW.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2016 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingDec 2023 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2016-016
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
MIDW
Connection point (POI)
North Kinsley 115 kV
Location
Edwards County, Kansas
Technology
Wind: 78.2 MW
Total requested
78.2 MW
Service type
Energy only (ERIS)
Study phase
TERMINATED
Queue status
Withdrawn
Entered queue
29 March 2016
Proposed online date
December 2023
Came online
December 2023

Location

Marker shows the centre of Edwards County; the queue data does not give exact sites.

Power plants in Kansas Β· Transmission lines in Kansas

Other requests in Edwards County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem