United States βΊ Grid βΊ Interconnection queues βΊ Kansas
ONSHORE WIND Β· SPPOnshore wind project GEN-2024-195, Edwards County
Onshore wind project GEN-2024-195, Edwards County is a 250 MW onshore wind request withdrawn in the SPP interconnection queue, in Edwards County, Kansas, connecting to ITCGP.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2025 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2024-195
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- ITCGP
- Connection point (POI)
- Post Rock - Spearville 345 kV Line
- Location
- Edwards County, Kansas
- Technology
- Wind: 250 MW
- Total requested
- 250 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 1 March 2025
- Proposed online date
- December 2028
Location
Marker shows the centre of Edwards County; the queue data does not give exact sites.
Other requests in Edwards County
- Solar project GEN-2019-055, Edwards CountySolar Β· 150 MW Β· agreement signed
- Battery storage project GEN-2019-053, Edwards CountyBattery storage Β· 50.0 MW Β· agreement signed
- Battery storage project GEN-2025-SR4, Edwards CountyBattery storage Β· 150 MW Β· in study
- Solar project GEN-2022-065, Edwards CountySolar Β· 145 MW Β· in study
- Solar project ERAS-2025-019, Edwards CountySolar Β· 80.0 MW Β· in study
- Onshore wind project GEN-2004-014, Edwards CountyOnshore wind Β· 152 MW Β· built
- Onshore wind project GEN-2008-060, Edwards CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project GEN-2024-196, Edwards CountyOnshore wind Β· 250 MW Β· withdrawn
- Onshore wind project GEN-2022-205, Edwards CountyOnshore wind Β· 250 MW Β· withdrawn
- Onshore wind project GEN-2022-204, Edwards CountyOnshore wind Β· 250 MW Β· withdrawn
- Onshore wind project GEN-2022-206, Edwards CountyOnshore wind Β· 250 MW Β· withdrawn
- Onshore wind project GEN-2024-197, Edwards CountyOnshore wind Β· 250 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem