United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

Borrego Solar 2

Borrego Solar 2 is a 49.5 MW solar request withdrawn in the CAISO interconnection queue, in San Diego County, California, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2008 (completed)
  2. Withdrawn / abandonedDec 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
420
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Borrego Substation 69kV
Location
San Diego County, California
Technology
Solar: 49.5 MW
Total requested
49.5 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 May 2008
Proposed online date
February 2013
Withdrawn
December 2009

Location

Marker shows the centre of San Diego County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in San Diego County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem