United States βΊ Grid βΊ Interconnection queues βΊ Alabama
SOLAR Β· SOUTHEASTSolar project IC-1208, Lowndes County
Solar project IC-1208, Lowndes County is a 120 MW solar request withdrawn in the Southeast interconnection queue, in Lowndes County, Alabama, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2023 (completed)
- Withdrawn / abandonedJan 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-1208
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- Burkville Substation 115 kV Bus
- Location
- Lowndes County, Alabama
- Technology
- Solar: 120 MW
- Total requested
- 120 MW
- Service type
- Energy only (ERIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 1 December 2023
- Proposed online date
- February 2027
- Withdrawn
- January 2025
Location
Marker shows the centre of Lowndes County; the queue data does not give exact sites.
Other requests in Lowndes County
- Solar + storage project IC-971, Lowndes CountySolar + storage Β· 80.0 MW Β· suspended
- Solar + storage project IC-955, Lowndes CountySolar + storage Β· 58.0 MW Β· suspended
- Coal project IC-100, Lowndes CountyCoal Β· 800 MW Β· withdrawn
- Coal project IC-103, Lowndes CountyCoal Β· 800 MW Β· withdrawn
- Solar project IC-968, Lowndes CountySolar Β· 300 MW Β· withdrawn
- Solar + storage project IC-1169, Lowndes CountySolar + storage Β· 200 MW Β· withdrawn
- Solar project IC-317, Lowndes CountySolar Β· 150 MW Β· withdrawn
- Solar + storage project IC-1182, Lowndes CountySolar + storage Β· 138 MW Β· withdrawn
- Gas project IC-388, Lowndes CountyGas Β· 100 MW Β· withdrawn
- Solar project 25-IC-AM, Lowndes CountySolar Β· 100 MW Β· withdrawn
- Solar + storage project IC-1093, Lowndes CountySolar + storage Β· 80.0 MW Β· withdrawn
- Solar + storage project IC-1020, Lowndes CountySolar + storage Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem