United States βΊ Grid βΊ Interconnection queues βΊ Indiana
BATTERY STORAGE Β· PJMBattery storage project AG1-376, Blackford County
Battery storage project AG1-376, Blackford County is a 30.0 MW battery storage request withdrawn in the PJM interconnection queue, in Blackford County, Indiana, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2020 (completed)
- Withdrawn / abandonedMar 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG1-376
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Sorenson-DeSoto 345 kV
- Location
- Blackford County, Indiana
- Technology
- Battery: 30.0 MW
- Total requested
- 30.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 30 September 2020
- Proposed online date
- October 2024
- Withdrawn
- March 2021
Location
Marker shows the centre of Blackford County; the queue data does not give exact sites.
Other requests in Blackford County
- Blackford Wind Energy ProjectOnshore wind Β· 200 MW Β· agreement signed
- Prairie Creek WindOnshore wind Β· 200 MW Β· agreement signed
- Lake Trout SolarSolar + storage Β· 200 MW Β· agreement signed
- Prairie Creek Wind Phase 2Onshore wind Β· 100 MW Β· agreement signed
- Lake Trout SolarSolar Β· 45.0 MW Β· agreement signed
- Teays River Wind FarmOnshore wind Β· 200 MW Β· in study
- Rosegold SolarSolar Β· 150 MW Β· in study
- Battery storage project AH1-768, Blackford CountyBattery storage Β· 110 MW Β· withdrawn
- Blackford County SolarSolar Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem