SOLAR · PJM

Lake Trout Solar

Lake Trout Solar is a 45.0 MW solar request with a signed interconnection agreement in the PJM interconnection queue, in Blackford County, Indiana, connecting to AEP.

Queue statusConsented
  1. PlanningQueued Mar 2020 (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingTarget Jan 2028 (not yet reached)
  5. Closed (not yet reached)

Request details

Queue ID
AF2-162
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Keystone-Desoto 345 kV
Location
Blackford County, Indiana
Technology
Solar: 45.0 MW
Total requested
45.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Active
Entered queue
16 March 2020
Proposed online date
January 2028

Location

Marker shows the centre of Blackford County; the queue data does not give exact sites.

Power plants in Indiana · Transmission lines in Indiana

Other requests in Blackford County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem