United States βΊ Grid βΊ Interconnection queues βΊ Kansas
SOLAR + STORAGE Β· SPPSolar + storage project GEN-2023-004, Cherokee County
Solar + storage project GEN-2023-004, Cherokee County is a 200 MW solar + storage request withdrawn in the SPP interconnection queue, in Cherokee County, Kansas, connecting to EDE.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2023 (completed)
- Withdrawn / abandonedDec 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2023-004
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- EDE
- Connection point (POI)
- Baxter Springs 161 kV Substation
- Location
- Cherokee County, Kansas
- Technology
- Solar: 200 MW Β· Battery
- Total requested
- 200 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 26 July 2023
- Proposed online date
- December 2026
- Withdrawn
- December 2023
Location
Marker shows the centre of Cherokee County; the queue data does not give exact sites.
Other requests in Cherokee County
- Solar + storage project GEN-2020-079, Cherokee CountySolar + storage Β· 225 MW Β· agreement signed
- Other project GEN-2024-GR4, Cherokee CountyOther Β· 27.1 MW Β· agreement signed
- Gas project GEN-2004-017, Cherokee CountyGas Β· 250 MW Β· built
- Gas project GEN-2014-028, Cherokee CountyGas Β· 50.0 MW Β· built
- Solar project GEN-2023-194, Cherokee CountySolar Β· 225 MW Β· withdrawn
- Battery storage project GEN-2023-191, Cherokee CountyBattery storage Β· 74.0 MW Β· withdrawn
- Gas project GEN-2003-010, Cherokee CountyGas Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem