United States βΊ Grid βΊ Interconnection queues βΊ New York
SOLAR Β· NYISOBeck Solar
Beck Solar is a 20.0 MW solar request withdrawn in the NYISO interconnection queue, in Chautauqua County, New York, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2022 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1391
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- ACE DevCo NC, LLC
- Connection point (POI)
- Hartfield - Moon Road 115 kV line
- Location
- Chautauqua County, New York
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Queue status
- Withdrawn
- Entered queue
- 21 June 2022
Location
Marker shows the centre of Chautauqua County; the queue data does not give exact sites.
Other requests in Chautauqua County
- South Ripley Solar and BESSSolar + storage Β· 270 MW Β· in study
- Lighthouse Energy StorageBattery storage Β· 250 MW Β· in study
- Basecamp BESSBattery storage Β· 170 MW Β· in study
- York Run SolarSolar Β· 90.0 MW Β· in study
- Dewdrop WindOnshore wind Β· 62.0 MW Β· in study
- Buttercup WindOnshore wind Β· 49.9 MW Β· in study
- Goldenrod WindOnshore wind Β· 39.0 MW Β· in study
- Cassadaga WindOnshore wind Β· 127 MW Β· built
- Cassadaga WindOnshore wind Β· 127 MW Β· built
- Ball Hill WindOnshore wind Β· 103 MW Β· built
- Ball Hill WindOnshore wind Β· 103 MW Β· built
- Arkwright SummitOnshore wind Β· 78.4 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem