United States › Grid › Interconnection queues › Minnesota
GAS · MISOReplacing 258MW ERIS gas/oil with 237MW ERIS Natural Gas/oil; Wheaton 1-4
Replacing 258MW ERIS gas/oil with 237MW ERIS Natural Gas/oil; Wheaton 1-4 is a 237 MW gas request in interconnection study in the MISO interconnection queue, in Chippewa County, Minnesota, connecting to NORTHERN STATES POWER COMPANY.
- PlanningQueued Mar 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- R1045
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- NORTHERN STATES POWER COMPANY
- Connection point (POI)
- Wheaton 161kV
- Location
- Chippewa County, Minnesota
- Technology
- Gas: 237 MW · Other
- Total requested
- 237 MW
- Service type
- Network resource (NRIS)
- Queue status
- Active
- Entered queue
- 1 March 2024
- Proposed online date
- June 2025
Location
Marker shows the centre of Chippewa County; the queue data does not give exact sites.
Other requests in Chippewa County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem