SOLAR Β· SPP

Solar project GEN-2017-103, Chippewa County

Solar project GEN-2017-103, Chippewa County is a 8.0 MW solar request withdrawn in the SPP interconnection queue, in Chippewa County, Minnesota, connecting to WAPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2017 (completed)
  2. Withdrawn / abandonedFeb 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2017-103
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
WAPA
Connection point (POI)
Granite Falls 230kV Substation
Location
Chippewa County, Minnesota
Technology
Solar: 8.0 MW
Total requested
8.0 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
20 May 2017
Proposed online date
October 2018
Withdrawn
February 2018

Location

Marker shows the centre of Chippewa County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Chippewa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem