United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
SOLAR Β· MISOSolar project J1647, Chippewa County
Solar project J1647, Chippewa County is a 150 MW solar request withdrawn in the MISO interconnection queue, in Chippewa County, Minnesota, connecting to NORTHERN STATES POWER COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandonedNov 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1647
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- NORTHERN STATES POWER COMPANY
- Connection point (POI)
- Maynard XMSN 115kV Substation
- Location
- Chippewa County, Minnesota
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 24 June 2020
- Proposed online date
- September 2023
- Withdrawn
- November 2020
Location
Marker shows the centre of Chippewa County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Chippewa County
- Replacing 258MW ERIS gas/oil with 237MW ERIS Natural Gas/oil; Wheaton 1-4Gas Β· 237 MW Β· in study
- Onshore wind project GEN-2016-036, Chippewa CountyOnshore wind Β· 44.6 MW Β· built
- Battery storage project J1693, Chippewa CountyBattery storage Β· 50.0 MW Β· withdrawn
- Solar project GEN-2017-103, Chippewa CountySolar Β· 8.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem