United States › Grid › Interconnection queues › Minnesota
ONSHORE WIND · SPPOnshore wind project GEN-2016-036, Chippewa County
Onshore wind project GEN-2016-036, Chippewa County is a 44.6 MW onshore wind request built and operating in the SPP interconnection queue, in Chippewa County, Minnesota, connecting to WAPA.
Request details
- Queue ID
- GEN-2016-036
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WAPA
- Connection point (POI)
- Granite Falls 115kV substation
- Location
- Chippewa County, Minnesota
- Technology
- Wind: 44.6 MW
- Total requested
- 44.6 MW
- Service type
- Energy only (ERIS)
- Study phase
- IA FULLY EXECUTED/COMMERCIAL OPERATION
- Queue status
- Operational
- Entered queue
- 28 March 2016
- Proposed online date
- December 2018
- Came online
- December 2018
Location
Marker shows the centre of Chippewa County; the queue data does not give exact sites.
Other requests in Chippewa County
- Replacing 258MW ERIS gas/oil with 237MW ERIS Natural Gas/oil; Wheaton 1-4Gas · 237 MW · in study
- Solar project J1647, Chippewa CountySolar · 150 MW · withdrawn
- Battery storage project J1693, Chippewa CountyBattery storage · 50.0 MW · withdrawn
- Solar project GEN-2017-103, Chippewa CountySolar · 8.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem