Solar + storage project Q102, Mohave County is a 930 MW solar + storage request withdrawn in the West interconnection queue, in Mohave County, Arizona, connecting to Los Angeles Department of Water and Power.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2023 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Q102
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Los Angeles Department of Water and Power
- Connection point (POI)
- Marketplace 500kV
- Location
- Mohave County, Arizona
- Technology
- Solar: 930 MW Β· Battery
- Total requested
- 930 MW
- Queue status
- Withdrawn
- Entered queue
- 28 April 2023
- Proposed online date
- November 2027
- Withdrawn
- July 2025
Location
Marker shows the centre of Mohave County; the queue data does not give exact sites.
Other requests in Mohave County
- Other project Q617, Mohave CountyOther Β· 1,000 MW Β· in study
- Solar + storage project 2023-MP2, Mohave CountySolar + storage Β· 600 MW Β· in study
- Other project 2024-G4, Mohave CountyOther Β· 550 MW Β· in study
- Onshore wind project NC5-008, Mohave CountyOnshore wind Β· 500 MW Β· in study
- Battery storage project 2023-G16, Mohave CountyBattery storage Β· 500 MW Β· in study
- Battery storage project 2023-G15, Mohave CountyBattery storage Β· 500 MW Β· in study
- Battery storage project 2024-MP2, Mohave CountyBattery storage Β· 500 MW Β· in study
- Battery storage project 2024-MP1, Mohave CountyBattery storage Β· 500 MW Β· in study
- Solar + storage project 25-00421, Mohave CountySolar + storage Β· 500 MW Β· in study
- Onshore wind project 2024-G5, Mohave CountyOnshore wind Β· 300 MW Β· in study
- Onshore wind project NC5-009, Mohave CountyOnshore wind Β· 300 MW Β· in study
- Solar + storage project 2023-G17, Mohave CountySolar + storage Β· 300 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem