United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

BATTERY STORAGE Β· SPP

Battery storage project GEN-2024-SR4, Yoakum County

Battery storage project GEN-2024-SR4, Yoakum County is a 300 MW battery storage request withdrawn in the SPP interconnection queue, in Yoakum County, Texas, connecting to Xcel/SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2024-SR4
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
Xcel/SPS
Connection point (POI)
Mahoney 230 kV Substation
Location
Yoakum County, Texas
Technology
Battery: 300 MW
Total requested
300 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
11 December 2023
Proposed online date
May 2026

Location

Marker shows the centre of Yoakum County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Yoakum County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem