United States › Grid › Interconnection queues › Oregon
ONSHORE WIND · WESTIberdrola Renewables Inc
Iberdrola Renewables Inc is a 100 MW onshore wind request withdrawn in the West interconnection queue, in Gilliam County, Oregon, connecting to Avangrid Power, LLC.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2002 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G109-01
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Avangrid Power, LLC
- Developer
- Avangrid Power, LLC
- Connection point (POI)
- Near Slatt 500kV Substation
- Location
- Gilliam County, Oregon
- Technology
- Wind: 100 MW
- Total requested
- 100 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 17 September 2002
- Proposed online date
- December 2003
Location
Marker shows the centre of Gilliam County; the queue data does not give exact sites.
Other requests in Gilliam County
- Other project G0768, Gilliam CountyOther · 600 MW · in study
- Solar + storage project G0989, Gilliam CountySolar + storage · 550 MW · in study
- Onshore wind project G0344, Gilliam CountyOnshore wind · 488 MW · in study
- Battery storage project G0941, Gilliam CountyBattery storage · 488 MW · in study
- Onshore wind project G0362, Gilliam CountyOnshore wind · 204 MW · in study
- Onshore wind project G0363, Gilliam CountyOnshore wind · 204 MW · in study
- Onshore wind project G1074, Gilliam CountyOnshore wind · 111 MW · in study
- Onshore wind project G0917, Gilliam CountyOnshore wind · 90.3 MW · in study
- Battery storage project G0709, Gilliam CountyBattery storage · 41.0 MW · in study
- Onshore wind project 10-037, Gilliam CountyOnshore wind · 500 MW · suspended
- Onshore wind project 09-035, Gilliam CountyOnshore wind · 401 MW · suspended
- Onshore wind project 11-040, Gilliam CountyOnshore wind · 200 MW · suspended
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem