United States β€Ί Grid β€Ί Interconnection queues β€Ί North Dakota

GAS Β· SPP

Gas project GEN-2023-062, Williams County

Gas project GEN-2023-062, Williams County is a 98.0 MW gas request withdrawn in the SPP interconnection queue, in Williams County, North Dakota, connecting to LYREC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2023 (completed)
  2. Withdrawn / abandonedAug 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2023-062
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
LYREC
Connection point (POI)
REN 115 kV Substation
Location
Williams County, North Dakota
Technology
Gas: 98.0 MW
Total requested
98.0 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
2 October 2023
Proposed online date
July 2028
Withdrawn
August 2025

Location

Marker shows the centre of Williams County; the queue data does not give exact sites.

Power plants in North Dakota Β· Transmission lines in North Dakota

Other requests in Williams County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem