United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

ONSHORE WIND Β· WEST

Onshore wind project 397, Washington County

Onshore wind project 397, Washington County is a 16.0 MW onshore wind request withdrawn in the West interconnection queue, in Washington County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2011 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
397
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Coleman - Toquerville line
Location
Washington County, Utah
Technology
Wind: 16.0 MW
Total requested
16.0 MW
Service type
Energy only (ERIS)
Study phase
IA Terminated - Failure to Meet Milestones
Queue status
Withdrawn
Entered queue
19 August 2011
Proposed online date
April 2016

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Washington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem