BATTERY STORAGE Β· MISO

Battery storage project J1860, Lenawee County

Battery storage project J1860, Lenawee County is a 60.0 MW battery storage request withdrawn in the MISO interconnection queue, in Lenawee County, Michigan, connecting to METC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2021 (completed)
  2. Withdrawn / abandonedMar 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1860
Grid region
MISO (Midcontinent)
Utility / transmission owner
METC
Connection point (POI)
Morocco to Beecher 138kV (8.36 miles from Morocco)
Location
Lenawee County, Michigan
Technology
Battery: 60.0 MW
Total requested
60.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 3; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
16 August 2021
Proposed online date
September 2024
Withdrawn
March 2025

Location

Marker shows the centre of Lenawee County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Other requests in Lenawee County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem