United States βΊ Grid βΊ Interconnection queues βΊ Montana
ONSHORE WIND Β· WESTOnshore wind project 101, Meagher County
Onshore wind project 101, Meagher County is a 800 MW onshore wind request withdrawn in the West interconnection queue, in Meagher County, Montana, connecting to NorthWestern Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2008 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 101
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NorthWestern Energy
- Connection point (POI)
- Near Ringling
- Location
- Meagher County, Montana
- Technology
- Wind: 800 MW
- Total requested
- 800 MW
- Service type
- Energy only (ERIS)
- Study phase
- Feasibility Study System Impact Study Facilities Study
- Queue status
- Withdrawn
- Entered queue
- 7 October 2008
- Proposed online date
- December 2013
Location
Marker shows the centre of Meagher County; the queue data does not give exact sites.
Other requests in Meagher County
- Onshore wind project 82, Meagher CountyOnshore wind Β· 600 MW Β· agreement signed
- Onshore wind project 83, Meagher CountyOnshore wind Β· 300 MW Β· agreement signed
- Onshore wind project C013, Meagher CountyOnshore wind Β· 326 MW Β· in study
- Onshore wind project C007, Meagher CountyOnshore wind Β· 300 MW Β· in study
- Battery storage project 310, Meagher CountyBattery storage Β· 450 MW Β· suspended
- Battery storage project C002, Meagher CountyBattery storage Β· 450 MW Β· suspended
- Onshore wind project 71, Meagher CountyOnshore wind Β· 300 MW Β· suspended
- Onshore wind project 46, Meagher CountyOnshore wind Β· 10.0 MW Β· built
- Onshore wind project 349, Meagher CountyOnshore wind Β· 3.0 MW Β· built
- Onshore wind project 350, Meagher CountyOnshore wind Β· 3.0 MW Β· built
- Onshore wind project 348, Meagher CountyOnshore wind Β· 3.0 MW Β· built
- Onshore wind project 162, Meagher CountyOnshore wind Β· 1.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem