πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Illinois

ONSHORE WIND Β· MISO

Onshore wind project G986, Woodford County

Onshore wind project G986, Woodford County is a 99.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Woodford County, Illinois.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2008 (completed)
  2. Withdrawn / abandonedNov 2008 (project stopped here)
  3. ConsentedNov 2008 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G986
Grid region
MISO (Midcontinent)
Connection point (POI)
Minonk - El Paso Substations 138kV
Location
Woodford County, Illinois
Technology
Wind: 99.0 MW
Total requested
99.0 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
18 March 2008
Agreement signed
12 November 2008
Proposed online date
June 2011
Withdrawn
November 2008

Location

Marker shows the centre of Woodford County; the queue data does not give exact sites.

Power plants in Illinois Β· Transmission lines in Illinois

Other requests in Woodford County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem