WIND + STORAGE · MISOWind + storage project J2690, Washington County
Wind + storage project J2690, Washington County is a 500 MW wind + storage request in interconnection study in the MISO interconnection queue, in Washington County, Illinois, connecting to AMEREN ILLINOIS.
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Apr 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J2690
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN ILLINOIS
- Connection point (POI)
- Other_
- Location
- Washington County, Illinois
- Technology
- Wind: 500 MW · Battery
- Total requested
- 500 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 15 September 2022
- Proposed online date
- April 2027
Location
Marker shows the centre of Washington County; the queue data does not give exact sites.
Other requests in Washington County
- Solar project J1094, Washington CountySolar · 150 MW · under construction
- Solar project J1216, Washington CountySolar · 250 MW · agreement signed
- Battery storage project J3316, Washington CountyBattery storage · 150 MW · in study
- Coal project IP14, Washington CountyCoal · 1,500 MW · built
- Coal project G495, Washington CountyCoal · 150 MW · built
- Other project IP11, Washington CountyOther · 500 MW · withdrawn
- Battery storage project J2422, Washington CountyBattery storage · 200 MW · withdrawn
- Solar project J2463, Washington CountySolar · 200 MW · withdrawn
- Solar project J1225, Washington CountySolar · 160 MW · withdrawn
- Solar project J1301, Washington CountySolar · 150 MW · withdrawn
- Solar project J3410, Washington CountySolar · 120 MW · withdrawn
- Solar + storage project J3013, Washington CountySolar + storage · 100 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem