SOLAR Β· SPP

Solar project GEN-2017-076, Benton County

Solar project GEN-2017-076, Benton County is a 52.2 MW solar request withdrawn in the SPP interconnection queue, in Benton County, Arkansas, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2017 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingDec 2024 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2017-076
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
AEP
Connection point (POI)
Chamber Springs 161kV sub
Location
Benton County, Arkansas
Technology
Solar: 52.2 MW
Total requested
52.2 MW
Service type
Energy only (ERIS)
Study phase
TERMINATED
Queue status
Withdrawn
Entered queue
28 May 2017
Proposed online date
December 2024
Came online
December 2024

Location

Marker shows the centre of Benton County; the queue data does not give exact sites.

Power plants in Arkansas Β· Transmission lines in Arkansas

Other requests in Benton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem