United States βΊ Grid βΊ Interconnection queues βΊ Arkansas
BATTERY STORAGE Β· SPPBattery storage project GEN-2023-213, Benton County
Battery storage project GEN-2023-213, Benton County is a 100 MW battery storage request withdrawn in the SPP interconnection queue, in Benton County, Arkansas, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandonedSep 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2023-213
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Chamber Springs 161 kV Substation
- Location
- Benton County, Arkansas
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 2 October 2023
- Proposed online date
- September 2028
- Withdrawn
- September 2025
Location
Marker shows the centre of Benton County; the queue data does not give exact sites.
Other requests in Benton County
- Solar project GEN-2018-064, Benton CountySolar Β· 80.0 MW Β· agreement signed
- Battery storage project GEN-2023-235, Benton CountyBattery storage Β· 250 MW Β· withdrawn
- Solar project GEN-2022-058, Benton CountySolar Β· 180 MW Β· withdrawn
- Onshore wind project GEN-2008-012, Benton CountyOnshore wind Β· 150 MW Β· withdrawn
- Battery storage project GEN-2023-232, Benton CountyBattery storage Β· 90.0 MW Β· withdrawn
- Solar + storage project GEN-2022-099, Benton CountySolar + storage Β· 80.0 MW Β· withdrawn
- Solar project GEN-2017-076, Benton CountySolar Β· 52.2 MW Β· withdrawn
- Onshore wind project GEN-2010-025, Benton CountyOnshore wind Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem