United States β€Ί Grid β€Ί Interconnection queues β€Ί Arkansas

SOLAR + STORAGE Β· SPP

Solar + storage project GEN-2022-099, Benton County

Solar + storage project GEN-2022-099, Benton County is a 80.0 MW solar + storage request withdrawn in the SPP interconnection queue, in Benton County, Arkansas, connecting to EDE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2023 (completed)
  2. Withdrawn / abandonedJun 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2022-099
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
EDE
Connection point (POI)
Decatur - Noel SW 161 kV substation
Location
Benton County, Arkansas
Technology
Solar: 80.0 MW Β· Battery
Total requested
80.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
24 March 2023
Proposed online date
October 2026
Withdrawn
June 2023

Location

Marker shows the centre of Benton County; the queue data does not give exact sites.

Power plants in Arkansas Β· Transmission lines in Arkansas

Other requests in Benton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem