πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

ONSHORE WIND Β· WEST

Onshore wind project 312, Wheatland County

Onshore wind project 312, Wheatland County is a 80.0 MW onshore wind request withdrawn in the West interconnection queue, in Wheatland County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2017 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
312
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
Martinsdale Substation
Location
Wheatland County, Montana
Technology
Wind: 80.0 MW
Total requested
80.0 MW
Service type
NRIS and ERIS
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
27 February 2017
Proposed online date
October 2019

Location

Marker shows the centre of Wheatland County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Wheatland County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem