SOLAR · CAISOIron Mountain Solar 2
Iron Mountain Solar 2 is a 49.5 MW solar request withdrawn in the CAISO interconnection queue, in Riverside County, California, connecting to SCE.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2008 (completed)
- Withdrawn / abandonedNov 2008 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 423
- Grid region
- CAISO (California)
- Utility / transmission owner
- SCE
- Connection point (POI)
- Camino-Iron Mountain 230kV line
- Location
- Riverside County, California
- Technology
- Solar: 49.5 MW
- Total requested
- 49.5 MW
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 30 May 2008
- Proposed online date
- February 2012
- Withdrawn
- November 2008
Location
Marker shows the centre of Riverside County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Riverside County
- OberonSolar + storage · 1,037 MW · agreement signed
- Grace Energy CenterSolar + storage · 1,017 MW · agreement signed
- EasleySolar + storage · 940 MW · agreement signed
- Athos Power PlantSolar + storage · 908 MW · agreement signed
- Lycan SolarSolar + storage · 800 MW · agreement signed
- Calypso SolarSolar + storage · 800 MW · agreement signed
- Menifee Power BankBattery storage · 680 MW · agreement signed
- Twin Palms SolarSolar + storage · 576 MW · agreement signed
- RedondaSolar + storage · 542 MW · agreement signed
- CobaltSolar + storage · 513 MW · agreement signed
- Double Butte StorageBattery storage · 508 MW · agreement signed
- Lake Elsinore Advanced Pumped Storage ProjectBattery storage · 500 MW · agreement signed
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem