Patton Wind Farm

Patton Wind Farm is a 30.6 MW onshore wind request built and operating in the PJM interconnection queue, in Cambria County, Pennsylvania, connecting to PENELEC.

Queue statusOperating
  1. PlanningQueued Aug 2009 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingDec 2012 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
V3-030
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PENELEC
Connection point (POI)
St. Benedict-Patton 46kV
Location
Cambria County, Pennsylvania
Technology
Wind: 30.6 MW
Total requested
30.6 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
31 August 2009
Proposed online date
June 2013
Came online
December 2012

Location

Marker shows the centre of Cambria County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Cambria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem