United States › Grid › Interconnection queues › Maryland
NUCLEAR · PJMCalvert Cliffs Units 1 and 2 (f/k/a PJM Queue M04)
Calvert Cliffs Units 1 and 2 (f/k/a PJM Queue M04) is a 28.1 MW nuclear request built and operating in the PJM interconnection queue, in Calvert County, Maryland, connecting to BGE.
Request details
- Queue ID
- AE1-001
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- BGE
- Connection point (POI)
- Calvert Cliffs 500kV
- Location
- Calvert County, Maryland
- Technology
- Nuclear: 28.1 MW
- Total requested
- 28.1 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 2 April 2018
- Proposed online date
- January 2023
- Came online
- February 2023
Location
Marker shows the centre of Calvert County; the queue data does not give exact sites.
Other requests in Calvert County
- Battery storage project AH2-423, Calvert CountyBattery storage · 180 MW · in study
- Clavert Cliffs 1 and 2Nuclear · 63.0 MW · built
- Calvert Cliffs Units 1 and 2 (f/k/a PJM Queue M04)Nuclear · 19.2 MW · built
- Calvert Cliffs Units 1 and 2 (f/k/a PJM Queue M04)Nuclear · 11.1 MW · built
- Chesapeake Beach BESSBattery storage · 1.0 MW · built
- Nuclear project V2-042, Calvert CountyNuclear · 1,640 MW · withdrawn
- Nuclear project Q77, Calvert CountyNuclear · 1,640 MW · withdrawn
- Calvert Cliffs Nuclear Power Plant Unit 3Nuclear · 1,640 MW · withdrawn
- Nuclear project K27, Calvert CountyNuclear · 35.0 MW · withdrawn
- Gas project I05, Calvert CountyGas · 6.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem