NUCLEAR Β· PJMNuclear project Q77, Calvert County
Nuclear project Q77, Calvert County is a 1,640 MW nuclear request withdrawn in the PJM interconnection queue, in Calvert County, Maryland, connecting to PEPCO.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2006 (completed)
- Withdrawn / abandonedMar 2007 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Q77
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PEPCO
- Connection point (POI)
- Calvert Cliffs
- Location
- Calvert County, Maryland
- Technology
- Nuclear: 1,640 MW
- Total requested
- 1,640 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 31 July 2006
- Proposed online date
- December 2016
- Withdrawn
- March 2007
Location
Marker shows the centre of Calvert County; the queue data does not give exact sites.
Other requests in Calvert County
- Battery storage project AH2-423, Calvert CountyBattery storage Β· 180 MW Β· in study
- Clavert Cliffs 1 and 2Nuclear Β· 63.0 MW Β· built
- Calvert Cliffs Units 1 and 2 (f/k/a PJM Queue M04)Nuclear Β· 28.1 MW Β· built
- Calvert Cliffs Units 1 and 2 (f/k/a PJM Queue M04)Nuclear Β· 19.2 MW Β· built
- Calvert Cliffs Units 1 and 2 (f/k/a PJM Queue M04)Nuclear Β· 11.1 MW Β· built
- Chesapeake Beach BESSBattery storage Β· 1.0 MW Β· built
- Nuclear project V2-042, Calvert CountyNuclear Β· 1,640 MW Β· withdrawn
- Calvert Cliffs Nuclear Power Plant Unit 3Nuclear Β· 1,640 MW Β· withdrawn
- Nuclear project K27, Calvert CountyNuclear Β· 35.0 MW Β· withdrawn
- Gas project I05, Calvert CountyGas Β· 6.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem