United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
SOLAR Β· PJMEvergreen Solar
Evergreen Solar is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Elk County, Pennsylvania, connecting to APS.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2020 (completed)
- Withdrawn / abandonedJan 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF2-295
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- Wilcox-Paper City 46 kV
- Location
- Elk County, Pennsylvania
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Withdrawn
- Entered queue
- 28 March 2020
- Proposed online date
- July 2027
- Withdrawn
- January 2025
Location
Marker shows the centre of Elk County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Elk County
- Solar project AI1-040, Elk CountySolar Β· 250 MW Β· in study
- Solar + storage project AI1-213, Elk CountySolar + storage Β· 174 MW Β· in study
- Jakes Hollow SolarSolar Β· 20.0 MW Β· suspended
- Gas project H24, Elk CountyGas Β· 575 MW Β· withdrawn
- PA-Fritz Kiln LLCSolar Β· 300 MW Β· withdrawn
- Seven Creek Energy - Squab HollowBattery storage Β· 290 MW Β· withdrawn
- Gas project B44, Elk CountyGas Β· 240 MW Β· withdrawn
- Battery storage project AF1-306, Elk CountyBattery storage Β· 197 MW Β· withdrawn
- Solar project AE2-177, Elk CountySolar Β· 165 MW Β· withdrawn
- Solar project AF1-220, Elk CountySolar Β· 152 MW Β· withdrawn
- Onshore wind project W4-012, Elk CountyOnshore wind Β· 120 MW Β· withdrawn
- EL-Mefferts RunSolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem