SOLAR Β· PJM

Solar project AG2-383, Coshocton County

Solar project AG2-383, Coshocton County is a 58.9 MW solar request withdrawn in the PJM interconnection queue, in Coshocton County, Ohio, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2021 (completed)
  2. Withdrawn / abandonedSep 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG2-383
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Conesville 138 kV
Location
Coshocton County, Ohio
Technology
Solar: 58.9 MW
Total requested
58.9 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
29 March 2021
Proposed online date
October 2023
Withdrawn
September 2023

Location

Marker shows the centre of Coshocton County; the queue data does not give exact sites.

Power plants in Ohio Β· Transmission lines in Ohio

Other requests in Coshocton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem