United States βΊ Grid βΊ Interconnection queues βΊ Iowa
ONSHORE WIND Β· MISOOnshore wind project J2466, Howard County
Onshore wind project J2466, Howard County is a 130 MW onshore wind request withdrawn in the MISO interconnection queue, in Howard County, Iowa, connecting to ITC MIDWEST.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2466
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC MIDWEST
- Connection point (POI)
- Hazleton-Mitchell County 345kV line
- Location
- Howard County, Iowa
- Technology
- Wind: 130 MW
- Total requested
- 130 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 September 2022
- Proposed online date
- October 2027
- Withdrawn
- October 2025
Location
Marker shows the centre of Howard County; the queue data does not give exact sites.
Other requests in Howard County
- Onshore wind project J898, Howard CountyOnshore wind Β· 100 MW Β· under construction
- Onshore wind project J3898, Howard CountyOnshore wind Β· 155 MW Β· in study
- Onshore wind project J1769, Howard CountyOnshore wind Β· 120 MW Β· in study
- Onshore wind project G551, Howard CountyOnshore wind Β· 99.0 MW Β· built
- Onshore wind project J614, Howard CountyOnshore wind Β· 66.0 MW Β· built
- Solar project J1413, Howard CountySolar Β· 300 MW Β· withdrawn
- Onshore wind project G445, Howard CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project J1979, Howard CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project G771, Howard CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project J030, Howard CountyOnshore wind Β· 198 MW Β· withdrawn
- Onshore wind project G716, Howard CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project G740, Howard CountyOnshore wind Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem