United States βΊ Grid βΊ Interconnection queues βΊ West Virginia
COAL Β· PJMCoal project X2-086, Grant County
Coal project X2-086, Grant County is a 77.0 MW coal request withdrawn in the PJM interconnection queue, in Grant County, West Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2011 (completed)
- Withdrawn / abandonedJan 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- X2-086
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Mt. Storm 115kV
- Location
- Grant County, West Virginia
- Technology
- Coal: 77.0 MW
- Total requested
- 77.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 29 July 2011
- Proposed online date
- December 2014
- Withdrawn
- January 2012
Location
Marker shows the centre of Grant County; the queue data does not give exact sites.
Power plants in West Virginia Β· Transmission lines in West Virginia
Other requests in Grant County
- Onshore wind project AG2-062, Grant CountyOnshore wind Β· 147 MW Β· in study
- Greenland Gap WFOnshore wind Β· 300 MW Β· built
- Greenland Gap WFOnshore wind Β· 60.0 MW Β· built
- Mount Storm Unit 2Coal Β· 38.0 MW Β· built
- Mount Storm Unit 1Coal Β· 38.0 MW Β· built
- Solar project AG2-655, Grant CountySolar Β· 500 MW Β· withdrawn
- Other project AI1-202, Grant CountyOther Β· 450 MW Β· withdrawn
- Battery storage project AH1-256, Grant CountyBattery storage Β· 240 MW Β· withdrawn
- Mount Storm Repower BESS 1Battery storage Β· 240 MW Β· withdrawn
- Onshore wind project X3-036, Grant CountyOnshore wind Β· 150 MW Β· withdrawn
- Mt. Storm Wind ForceOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project H04_W64, Grant CountyOnshore wind Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem