United States β€Ί Grid β€Ί Interconnection queues β€Ί Arkansas

ONSHORE WIND Β· MISO

Onshore wind project J3374, Phillips County

Onshore wind project J3374, Phillips County is a 65.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Phillips County, Arkansas, connecting to ENTERGY ARKANSAS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedSep 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3374
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY ARKANSAS
Connection point (POI)
RITCHIE SWYD - TARLETON 230.0kV
Location
Phillips County, Arkansas
Technology
Wind: 65.0 MW
Total requested
65.0 MW
Service type
Energy only (ERIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
18 April 2024
Proposed online date
October 2028
Withdrawn
September 2025

Location

Marker shows the centre of Phillips County; the queue data does not give exact sites.

Power plants in Arkansas Β· Transmission lines in Arkansas

Other requests in Phillips County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem