United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOE Main Street, Wallkill
E Main Street, Wallkill is a 20.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Ulster County, New York, connecting to O&R.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandonedOct 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1033
- Grid region
- NYISO (New York)
- Utility / transmission owner
- O&R
- Developer
- 212 Solar Development, LLC
- Connection point (POI)
- Shoemaker - E Wallkill line
- Location
- Ulster County, New York
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Queue status
- Withdrawn
- Entered queue
- 19 June 2020
- Withdrawn
- October 2020
Location
Marker shows the centre of Ulster County; the queue data does not give exact sites.
Other requests in Ulster County
- Alcazar 2Battery storage · 150 MW · in study
- Lincoln Park DG, LLCBattery storage · 150 MW · in study
- Marlboro StorageBattery storage · 100 MW · in study
- Alcazar 1Battery storage · 100 MW · in study
- Kce NY 34Battery storage · 100 MW · in study
- Kce NY 5Battery storage · 94.0 MW · in study
- Magruder BESSBattery storage · 20.0 MW · in study
- Alcazar Energy StorageBattery storage · 250 MW · withdrawn
- NY New Paltz 540 State Rte 32 S StorageBattery storage · 221 MW · withdrawn
- Lincoln ParkBattery storage · 150 MW · withdrawn
- Pine Hill Energy StorageBattery storage · 120 MW · withdrawn
- Highland StorageBattery storage · 115 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem