United States βΊ Grid βΊ Interconnection queues βΊ Indiana
ONSHORE WIND Β· MISOOnshore wind project J1150, Miami County
Onshore wind project J1150, Miami County is a 30.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Miami County, Indiana, connecting to DUKE ENERGY INDIANA.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedAug 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1150
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- DUKE ENERGY INDIANA
- Connection point (POI)
- Deedsville 345 kV Substation
- Location
- Miami County, Indiana
- Technology
- Wind: 30.0 MW
- Total requested
- 30.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Proposed online date
- September 2020
- Withdrawn
- August 2018
Location
Marker shows the centre of Miami County; the queue data does not give exact sites.
Other requests in Miami County
- Solar project J1743, Miami CountySolar Β· 293 MW Β· in study
- Solar project J3719, Miami CountySolar Β· 200 MW Β· in study
- Solar project J2307, Miami CountySolar Β· 130 MW Β· in study
- Solar project J2709, Miami CountySolar Β· 228 MW Β· withdrawn
- Onshore wind project J1018, Miami CountyOnshore wind Β· 150 MW Β· withdrawn
- Battery storage project J1678, Miami CountyBattery storage Β· 74.7 MW Β· withdrawn
- Solar project J3390, Miami CountySolar Β· 37.0 MW Β· withdrawn
- Battery storage project J2308, Miami CountyBattery storage Β· 35.0 MW Β· withdrawn
- Solar + storage project J2778, Miami CountySolar + storage Β· 15.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem