πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Arkansas

SOLAR Β· SPP

Solar project GEN-2022-093, Hempstead County

Solar project GEN-2022-093, Hempstead County is a 83.0 MW solar request withdrawn in the SPP interconnection queue, in Hempstead County, Arkansas, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2022 (completed)
  2. Withdrawn / abandonedMar 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2022-093
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
AEP
Connection point (POI)
Turk - Hope 115 kV line
Location
Hempstead County, Arkansas
Technology
Solar: 83.0 MW
Total requested
83.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
15 November 2022
Proposed online date
April 2027
Withdrawn
March 2025

Location

Marker shows the centre of Hempstead County; the queue data does not give exact sites.

Power plants in Arkansas Β· Transmission lines in Arkansas

Other requests in Hempstead County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem