United States › Grid › Interconnection queues › Arkansas
SOLAR · SPPSolar project GEN-2024-226, Hempstead County
Solar project GEN-2024-226, Hempstead County is a 300 MW solar request in interconnection study in the SPP interconnection queue, in Hempstead County, Arkansas, connecting to AEP.
Queue statusIn planning
- PlanningQueued Mar 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2030 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2024-226
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- AEP
- Connection point (POI)
- John W Turk Jr Power Plant 345 kV Substation
- Location
- Hempstead County, Arkansas
- Technology
- Solar: 300 MW
- Total requested
- 300 MW
- Service type
- NRIS and ERIS
- Study phase
- DISIS STAGE
- Queue status
- Active
- Entered queue
- 1 March 2025
- Proposed online date
- September 2030
Location
Marker shows the centre of Hempstead County; the queue data does not give exact sites.
Other requests in Hempstead County
- Battery storage project GEN-2024-227, Hempstead CountyBattery storage · 200 MW · in study
- Coal project GEN-2006-010, Hempstead CountyCoal · 620 MW · built
- Coal project GEN-2013-011, Hempstead CountyCoal · 30.0 MW · built
- Coal project GEN-2006-011, Hempstead CountyCoal · 605 MW · withdrawn
- Solar project GEN-2022-239, Hempstead CountySolar · 350 MW · withdrawn
- Battery storage project GEN-2022-241, Hempstead CountyBattery storage · 200 MW · withdrawn
- Battery storage project GEN-2022-240, Hempstead CountyBattery storage · 200 MW · withdrawn
- Solar + storage project GEN-2024-214, Hempstead CountySolar + storage · 120 MW · withdrawn
- Solar + storage project GEN-2023-151, Hempstead CountySolar + storage · 100 MW · withdrawn
- Solar project GEN-2022-093, Hempstead CountySolar · 83.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem