United States β€Ί Grid β€Ί Interconnection queues β€Ί South Dakota

ONSHORE WIND Β· SPP

Onshore wind project GEN-2020-019, Tripp County

Onshore wind project GEN-2020-019, Tripp County is a 108 MW onshore wind request withdrawn in the SPP interconnection queue, in Tripp County, South Dakota, connecting to WAPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedNov 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2020-019
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
WAPA
Connection point (POI)
Witten Substation -Fort Randall 115 kV
Location
Tripp County, South Dakota
Technology
Wind: 108 MW
Total requested
108 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
29 April 2020
Proposed online date
August 2027
Withdrawn
November 2022

Location

Marker shows the centre of Tripp County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Other requests in Tripp County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem