ONSHORE WIND Β· WESTOnshore wind project GI-0809, Tripp County
Onshore wind project GI-0809, Tripp County is a 150 MW onshore wind request withdrawn in the West interconnection queue, in Tripp County, South Dakota, connecting to WAPA/BEPC/HCPD Integrated System.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2008 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-0809
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Winner-Gregory 115kV
- Location
- Tripp County, South Dakota
- Technology
- Wind: 150 MW
- Total requested
- 150 MW
- Service type
- NRIS and ERIS
- Study phase
- IAP
- Queue status
- Withdrawn
- Entered queue
- 5 May 2008
- Proposed online date
- June 2010
Location
Marker shows the centre of Tripp County; the queue data does not give exact sites.